Chetwynd, British Columbia
Highway 29 is a section of road that connects Chetwynd and Tumbler Ridge. In June 2006, LNB Construction commenced work on the construction of a new roadway alignment through an area effected by a large landslide.
- Traffic management
- Construction and maintenance of detour route around entire construction site during slide repair
- Excavating and hauling 40,000 cubic metres to waste site
- Drilling, blasting and removal of 15,000 cubic metres of rock
- Grading of slopes
- Sub grade shaping and placement of 8,000 cubic metres of
base gravel
Project Engineer: Urban Systems, Fort St. John; British Columbia Ministry of Transportation, British Columbia